Drax granted consent for 299MW gas turbine in Wales

Drax has been granted a development consent order to build a 299MW open-cycle turbine at Abergelli Farm near Felindre in South Wales. The power station will provide flexible backup generation to the fill the gaps in renewable output.

Close
Close

Request a call back