Tideway floats largest structure ever to pass along the Thames

Utility Week speaks to the team behind a two-year project to float a 3,700-tonne culvert across the Thames – a very public engineering feat that was successfully carried out last week.

Close
Close

Request a call back

[contact-form-7 404 "Not Found"]